Up gradation of SIFY net work -reg
from: | Sardar S.B nfpechittoor@gmail.com | ||
to: | DASV Prasad <PRASADDASV@gmail.com>, dasv prasad <dasv_prasad@yahoo.com> | ||
date: | Wed, Nov 1, 2017 at 12:22 PM | ||
subject: | Up gradation of SIFY net work -reg | ||
mailed-by: | gmail.com |
Sir,
This is regarding up gradation band width of SIFY net work. As per TCS specification minimum band width required is 2 mbps for offices having 4-6 systems. But the following MDG/ LSG offices (having 5-8 systems) in Chittoor Division are having only 256 kbps band width due to which Finacle and CSI work badly delayed.. Circle office, Vijayawada has given directions to SIFY management to up grade the band width of these offices from 256 kbps to 512 kbps on 16.05.2017. Till date the same has been not done by SIFY. Hence kindly take up the issue at higher level to resolve the problem.
1.Palamaner MDG
2.Kuppam LSG Office
3.Punganur LSG Office
4.Chittoor Collectorate
5.O/o SSPOs, Chittoor
Thanking you Sir,
Yours faithfully,
S.B.SARDAR
COS, AIPEU PIII
at, Chittoor
No comments:
Post a Comment